OXBOW ROAD WATERLINE REPLACEMENT
The project consists of removal and installation of approximately 1,100 feet of 6-inch Asbestos Cement (AC) and C900 PVC pipe, respectively, between F 3/10 Rd and F 1/2 Rd; including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
PRE-BID MEETING
- Mandatory
- May 16, 2024
- Intersection of Oxbow Rd and F 3/10 Road
BID DATE
- May 23, 2024
- Ute Water - 2190 H ¼ Road
10 ROAD WATERLINE REPLACEMENT
The project consists of installation of approximately 6,400 feet of 8-inch C900 PVC pipe, including installationof fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
PRE-BID MEETING
- Mandatory
- March 28, 2024
- Intersection of 10 Road and Q 3/4 Road
BID DATE
- April 4, 2024
- Ute Water - 2190 H ¼ Road
F 1/2 ROAD PARKWAY - PHASE 1
The project consists of installation of approximately 1,700 feet of 8-inch C900 PVC pipe, approximately 400 feet of 12-inch C900 PVC pipe and approximately 150 feet of 10-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
PRE-BID MEETING
- Mandatory
- July 13, 2023
- Intersection of Market Street and F 1/2 Road
BID DATE
- July 20, 2023